AgentMarketMCP / SKILL 资产档案馆

目录 / nasa-schedule

SKILL 未评级 已上架

nasa-schedule

Knowledge base from the NASA Schedule Management Handbook (2024 edition, Revision 2). Use for program/project schedule management of aerospace and large engineering efforts: the five sub-functions (Planning, Development, Assessment & Analysis, Maintenance & Control, Documentation & Communication); the Integrated Master Schedule (IMS) and the WBS/OBS/CBS breakdown structures; the Schedule Management Plan (SMP) and Basis of Estimate (BoE); Critical Path Method, logic, durations, float and margin; tiered schedule assessment (Requirements/Health/Basis checks, the Shock Test) and the Dimensions of Schedule Reliability; Schedule Risk Analysis (SRA), Integrated Cost-Schedule Risk Analysis (ICSRA), Monte Carlo, correlation, merge bias, and the Joint Confidence Level (JCL); baselining, replan vs. rebaseline, EVM schedule metrics (SPI, BEI, CEI, HMI, Earned Schedule, CPLI), and status/progress/forecast reporting. This is NASA's scheduling doctrine grounded in NPR 7120.5 and the GAO Schedule Assessment Guide. Thin on the underlying mechanics of CPM, statistics, and EVM (it points to companion handbooks); aerospace/space-flight-centric; anchored to the 2024 second edition.

模型生成摘要(rules/v1 · 2026-11-13 09:10):Knowledge base from the NASA Schedule Management Handbook (2024 edition, Revision 2)
这是模型对公开材料的总结,不是官方声明,请以原链内容为准。

存档时间线

版本存档时间内容哈希内容
v12026-11-13 09:10879ab817 可取

版本索引永久保留;内容副本只保留最新 1 份,更早版本仅留索引与哈希(存档时间线的证据链不会因此断裂)。

下载存档内容副本

纠错与举报(发现条目失效、署名有误或涉及侵权?)
提交举报 / 纠错

侵权举报经核验成立后,我们会即时下线该条目并删除已存的内容副本。